|
Construction
of New Chemical Stores Building.
Substructure up to dpc level for new steel framed building
and new access road.
The works included bulk excavation, filling with stone, reinforced
concrete ground beams, pile caps, floors and retaining walls,
foul water and surface water drainage.
Client: Simons Construction Limited
|