| Improvement
and upgrade of existing works.
Construction of Kiosk foundations slabs, inlet pumping station,
delivery pipework and control building extension.
The works included deep excavation, stone filling, reinforced
concrete slabs, deep reinforced concrete tank, reinforced
concrete
bases, building work, ductile iron pipework (300mm diameter
- 150mm diameter), structural metalwork and concrete hardstands.
Client: Costain for Yorkshire Water
|