Stamford Bridge Waste Water
Treatment Works
   
Improvement and upgrade of existing works.

Construction of Kiosk foundations slabs, inlet pumping station, delivery pipework and control building extension.


The works included deep excavation, stone filling, reinforced concrete slabs, deep reinforced concrete tank, reinforced
concrete bases, building work, ductile iron pipework (300mm diameter - 150mm diameter), structural metalwork and concrete hardstands.

Client: Costain for Yorkshire Water

B Jeffrey Construction Limited
9 Devonshire Court, Green Lane Trading Estate, Clifton, York, YO30 5PQ Tel: (01904) 479722 • Fax: (01904) 693165